The Hengqin Bridge spans 1,425 meters in length and 31 meters in width. Featuring a symmetrically sequenced structure and prism-shaped bridge towers, it stands as Zhuhai City's first single-tower, double-cable-plane cable-stayed bridge. Completed and opened to traffic in 1999, the bridge serves as the gateway connecting Hengqin Island to the mainland.
In June 2019, the Hengqin Bridge Lighting Enhancement Project was completed. The project primarily involved the layout of lighting fixtures and the construction of lighting power distribution and control systems. Covering a total length of approximately 1,405 meters, the scope included the main bridge deck, approach spans, bridge belly (soffit), and piers. Specifically, 592 sets of
LED flood lights were installed on the bridge soffit, accompanied by the installation of 11,000 meters of metal conduits and the laying of 15,100 meters of cables.
The upgraded lighting system for Hengqin Bridge operates in three distinct modes: Daily Mode, Festive Mode, and Holiday Mode. An intelligent control system allows for dynamic adjustment of the light sources based on requirements.
Adorned with the new LED flood lights, Hengqin Bridge now dazzles with vibrant colors. This transformation showcases the rapid development of the Hengqin New Area, elevates the regional urban image, and stands as a symbol of the city's prosperity and vitality.
______________________________________________
Product Type
flood light 700*350*270mm RGBW 300W
flood light 424*391*297mm 2700K 90W
______________________________________________
Source: Zhuhai Da Heng Qin Company Limited